Case Studies

STI Group treats each project as an opportunity to earn future work and create a lasting relationship with the client being served

Our Projects

Servicing all three phases of the Oil and Gas Industry, our work is backed by experience, expertise and the relentless pursuit of client satisfaction. As a turnkey service provider STI Group partners acts as a single point of contact from design to delivery in most cases.

Rain CII Boiler Installation Project

STI Group was selected as the contractor to erect a Waste Heat Boiler and all associated equipment at Rain CII in Sulphur, LA. The project included the erection of the

Motiva Crude Expansion Project

Overview The Motiva Refinery, located in Port Arthur, Texas, has a daily crude oil processing capacity of 600,000 barrels per day. The Port Arthur Crude Expansion Project was a $7

EPC Pipe Fabrication

Our fabrication projects consist of large capital projects with thousands of spools to one spool orders. On this project STI fabricated and delivered over 5,300 spools. Size ranged from 1/2"

AKER KFELS Mast Manufacturing & Installation

Overview The mast is one of the most integral pieces in a drilling operation. This steel structure keeps the drilling rig connected with the drilling machinery while allowing easier access

Transload Oil & Gas Railport

Overview Both the production and the demand for crude oil is at an all-time high in the United States and it is expected to continuing growing exponentially. Strategically, the Southeast